|
| |
February 10th
|
| |
Home
View Jobs
Post Job
View Resumés
Post Resumé
My Account
|
|
|
| Reference ID: | CV-BJEZCAA |
| Updated: | January 09, 2010 |
| Available: | Immediately |
| Will Relocate: | Yes |
| GIS Experience: | 8 years |
| Desired Salary: | $2500 / month |
| |
| | | | |
|
|
| | | Anoop Balan | | | | Educational Experience |
| Board of Technical Education | Kerala | Degree: Diploma in Civil Engineering. Dates: 1995 - 1997 | | Center for Environment and Development | Kerala | Degree: Diploma in Geographical Information System & Dates: 2003 |
| | | | Professional Experience |
| Dy Manager (GIS Dept) | Reliance Communications Ltd | | July 2002 - Till date | Kochi | GIS
Preparation of IFC’s for BTS,Customer Connectivity, Network business Expansion using Auto CAD.
Building Feature Updation + Attribute Updation (Inputs in CAD format, Based on lat-long inputs, Inputs marked in hard copy map).
Land base Survey: Field Survey (Includes following activities : Issuing grid maps for survey, field survey by vendor, Field & Data QC).
Land base Survey: Using Trimble.
Preparation of maps : MXD preparation (layerisation / symbology as per requirement) + Prints.
Digitization Using Google Earth : Currently land base not available in geodatabase.
Planning & Preparation of Optical Fiber routes.
Mid / Mif conversion of AutoCAD Drawings.
As built data preparation of NBB , MA,SDCA and BTS routes through Auto CAD Map for migrating the data’s to GDB.
Reconciling, Posting the Geodatabase.
Network Engineer (Telcordia Technologies 4.1.6.8) ISP & OSP
Inventory data preparation in NE in coordination with Fixed Access team.
Data capturing of all Equipments, frames, cards etc in each and every node (MCN, BTS, BN, BOI etc).
Detailed view creation (Floor, rack etc) for every equipment placed in NE.
Detailed Fiber data preparation for each and every BTS sites in kerala & connectivity between towers.
Capturing of different types of existing Fiber & Copper network (NBB, SDCA, MA ring) with its Duct allocation.
Fiber to fiber as well as fiber to equipment connections is done for every fiber captured in CAD & NE.
Data capturing of all Equipments, Cards etc in each and every node (MCN, BTS, BOI etc) and connection of all equipments.
Updation of detailed splicing report with link loss for all splice location.
Linking of external document (detailed connectivity of each & every BOI) to corresponding Building Node (Where DLC is place)
| | CAD/GIS Engineer | Reliance Engineering Associated Pvt Ltd | | April 2001 - July 2002 | Kochi | Preparation of IFC’s for BTS,Customer Connectivity, Network business Expansion using Auto CAD.
Building Feature Updation + Attribute Updation (Inputs in CAD format, Based on lat-long inputs, Inputs marked in hard copy map).
Planning & As built Preparation of Optical Fiber routes. |
| | | | Other Information | 8+ years of experience in GIS & NE applications.
Presently working as Deputy Manager (GIS/NE Dept) with Reliance Communication Ltd, Cochin.
Handled Telecom GIS activities in various roles.
Hands on experience in Network Engineer (Telcordia Technologies 4.1.6.8) | | | Keywords: | ArcGIS, ArcInfo, ArcView, AutoCAD Map, AutoCAD | |
|
|
|