|
| |
February 10th
|
| |
Home
View Jobs
Post Job
View Resumés
Post Resumé
My Account
|
|
|
| Reference ID: | CV-BIJNPVC |
| Updated: | August 28, 2011 |
| Available: | Immediately |
| Will Relocate: | Yes |
| GIS Experience: | 3 years |
| Desired Salary: | 2.0 to 3.0 |
| |
| | | | |
|
|
| | | Dipak Pathak | | | | Educational Experience |
| north maharashtra university,jalgaon | Jalgaon,maharashtra. | Degree: B.A. |
| | | | Professional Experience |
| Geographic Analyst | Riding Consulting Engineers IndiaPvt.Ltd. | | 19 Oct 2010 to Present | Noida,Delhi | | To handle surveyor team & To QC Check theire Data | | GIS Survey Executive | RMSI Pvt Ltd. | | 17 Aug 2010 To 17 Oct 2010 | Mumbai | | To Take GCP Point for MSEB (R-APDRP) Project | | DGPS Engg. | Biond Software Technologies Pvt Ltd | | 28 Jan 2008 To 16 Aug 2010 | Dombivali (Mumbai) | | GPS Road Survey,To collect POI & Attributes on road in All over India. |
| | | | Other Information | CURRICULUM VITAE
DIPAK MURLIDHAR PATHAK
dmpathak76@gmail.com Phone No. +919096352621
Objective
• Looking for a challenging career in the field of GPS & GIS.
Experience
Currently working in Ridings Consulting Engineers India Pvt.Ltd. as Geographic Analyst From 19 Oct 2010 to till data
Experience of 2 Month in RMSI Private Ltd, Navi Mumbai as GIS Survey Executive in Core Geospatial and Utilities unit from 17 Aug 2010 to 17 Oct 2010.
Experience of 2 Years and 7 Months in BIOND SOFTWARE PVT.LTD as DGPS Engineer from 08 Jan 2008 to 16 Aug 2010.
Project Work Summary
Role and Responsibility:-
I have total experience of more than 3 years in the Field Data Collection of GPS (Trimble R3 and Guno series, Omnistar Garmin GPS), DGPS and GIS in Geographic and maps fields.
Project Detail :-
I) RIDINGS CONSULTING ENGINEERS INDIA PVT LTD.
1. Functional Class Drive :-
This project working for NAVTEQ India Pvt Ltd
NATIONAL HIGHWAY & STATE HIGHWAY (ROAD ATTRIBUTES AND POI)
This project create image (photo) map of all National Highways & State Highways with their names take point of multidividers, physical and legal dividers, Point of Interest of all routes of this highway which shows lot of information of ATMs, 5 star-3star Hotels,
Restaurant, Petrol Pumps, Airports, and Bus stations, Cinema Theaters, Education point,
Pharmacy point, Parking area, Police stations, Hospitals, Post offices. Solve
MIR of field Data Collection & also Solve overlapping to their Projects.
II) RMSI PVT LTD:-
1. GCP Point (Ground Control Point):-
This project working for our GSP Partner L&T for Mahavitaran
R-APDRP IT Project.
III) BIOND SOFTWARE PVT.LTD
1. GIS Survey of lamp pole for Bhiwandi Corporations, Maharashtra, India.
Create map by surveying the all lamp pole in area of Bhiwandi corporation.This
Project shows all poles Panel, Bracket, Pole Height, Pole watt in all pole of
Bhiwandi Corporation area by using GIS System.
2. Create GIS Map of all Pune City for the use of Pune Police.:-
Create GIS Map of all Pune city for the purpose of Pune Police for traffic.
This project shows map of footpath start-end, width, road & divider start-end,
Width, traffic signals & all important of road like no entry, one way status.
3. RMSI Company projects for Bharti airtel:-
Create Map by survey of underground fiber optics loop chamber and Splice
Chamber using GPS system for Airtel and also measured distance between two
Chambers. Survey of BCL connectivity and survey of all its attributes by using GPS.
4. CONNECTOR PHASE-1:-
NATIONAL HIGHWAY (ROAD ATTRIBUTES AND POI)
Connector Phase-1 for Genesis & Navteq, create for Nokia N95 mobile with navigator.
This project create map of all National Highways with their names, take point
of multidividers, physical and legal dividers, Point of Interest of all routes of
This highway which shows lot of information of ATMs, 5 star-3star Hotels,
Restaurant, Petrol Pumps, Airports, Bus stations, Cinema Theaters, Education point,
Pharmacy point, Parking area, Police stations, Hospitals, Post offices, forest area
Like this we take more than 50-70 points. Using GPS system.
5. CONNECTOR PHASE-2:-
Project worked For Genesis & Navteq Company (NOKIA).
It is same as phase-I but it cover STATE HIGHWAY AND ALL ROADS
(ROAD ATTRIBUTES AND POI) points.
6. CONNECTOR PHASE-3:-
Project worked For Genesis & Navteq Company (NOKIA).
Minor Road and all roads. This projects same as phase 1 & phase 2.
7. GCP Point(Ground Control Point):-
This project worked for Jaipur, Bangalore, Mumbai, Nagpur, Chandigarh,
Delhi Police, Punjab.
Technical Skill
Operating System - Windows 98/2000/ XP, VISTA.
Software Knowledge - AutoCAD, Kosmo, QGIS, Atlas
GPS Knowledge -Hp view 8300, 8305, Omnistar 5120 vbs, Trimble R3
(Rover), Trimble Juno & Garmin
Hardware Knowledge - Installation of O.S. as Windows 98/XP/Vista/2000/win 7,
Assemble and Configure PC.Configuring
& Troubleshooting Hardware Devices & Drivers.
Academic Profile
COURSE BOARD/UNIVERSITY YEAR RESULT
B.A. N.M.U., Jalgaon 2010 Appear
XII Nasik Board 2005 56.33%
X Nasik Board 2003 46.80%
• Completed “Personal Computer Maintenance” Course in Abhinav Tech.Institute, Jalgaon.
• Completed with 85% “Personal Computer Maintenance (Maharashtra State Board of Vocational Examination, Mumbai.)” Exam.
Hobbies
 Surfing internet, Playing Cricket, Making friends, Traveling, Listening Music.
Personal details
Name : Pathak Dipak Murlidhar.
DOB : 14th Aug 1986.
Permanent Address : 401Swami Samarth Appt.Lokmanya
Thane (W)
Nationality : Indian.
Strengths : Punctuality & Hardworking.
Languages known : Marathi, Hindi & English.
Declaration
I hereby declare that the above written particulars are true to the best of my knowledge and belief.
Place: MUMBAI (DIPAK MURLIDHAR PATHAK) | | | Keywords: | ArcGIS, ArcPad, Atlas GIS, AutoCAD, GPS | |
|
|
|