|
| |
February 9th
|
| |
Home
View Jobs
Post Job
View Resumés
Post Resumé
My Account
|
|
|
| Reference ID: | CV-BIDEPDU |
| Updated: | December 26, 2009 |
| Available: | Immediately |
| Will Relocate: | Yes |
| GIS Experience: | >10 Years |
| Desired Salary: | USD 5000 per month |
| |
| | | | |
|
|
| | | Ramasamy Veerasekaran | | | | Educational Experience |
| State Board of Technical Education | Tamil nadu - India | Degree: Diploma Electrical & Electronics Engineering Major: Electrical Dates: April 1989 - October 1992 |
| | | | Professional Experience |
| Field Engineer | WorleyParsons Resources & Energy | | December 2008 - October 2009 | Abudhabi | Responsible for the Management of the Engineering and Construction activities as a field engineer and QA/QC Inspector for QA/QC activities for assigned area of Power Plant and turnkey packages related to
Requests for Field Inspection, RFIs – receive, inspect the installation as per Project specification, local and international standards, provide response, advice proposed changes and approve or reject RFIs
Requests for Concession, RFCs – receive, analyse, provide response, solicit input as required and expedite the response for expedient resolution of the RFC.
Site Engineering Queries, SEQs - receive, analyse, provide response, solicit input as required and expedite the response for expedient resolution of the SEQ.
Non Conformance Reports, NCRs - receive, analyse, review and accept or reject disposition, verify compliance with disposition, solicit input as required and validate or deny NCR for closure.
Work Method Statements, WMS - receive, analyse, review, advise proposed changes and
approve or reject WMS.
Providing engineering expertise, monitoring the contractor’s construction, site inspection, and witness for Electrical site acceptance testing for the following activities of Power Plant.
Installation of Earthing, Cathodic protection, underground conduit & race way for electrical & instrumentation Systems.
Installation of Electrical & Instrumentation activities for 6 x 260 MW, 15.75 KV Gas Turbine & 2 x 345 MW, 17 KV Steam Turbine Generator and accessories– GE Make 9FA Frame.
Installation of 6 x 390 MVA, 15.75/220 KV& 2 x 495 MVA, 17 /220KV Generator Step Up Transformer, accessories, IPB’s & switch gear etc..,
| | Assistant Engineer Electrical | Technital S.p.A Qatar Branch | | March 2007 to October 2008. | Qatar | To monitor contractor’s construction, site inspection and Electrical site acceptance testing activities for Laying, Splicing, Testing & Commissioning of 66KV, 11KV & 415V cables, 11KV/415V Sub stations, Street Lighting poles & High Masts
Attend co ordination and follow up site meetings with the client and contractor representatives.
Review and approve material and shop drawings, perform assessment of contractor progress and recommend remedial actions as necessary to ensure quality control and timely execution of all site activities for design and supervision teams.
| | Project Engineer | Power Links Qatar LLC. – Doha, Qatar | | July 2004 to November 2006 | Qatar | Onshore LNG Expansion Project, Train 4&5- Ras Laffan for M/s Fujikura Ltd& M/s CCIC, Installation of EHV (132KV), HV, & LV cables, Transformers & switch gears, testing and commissioning.
Design and field engineering for MV, LV cable circuits, 11KV/415V substations, Installation of cables & accessories for ERC/1400/D3/C1 – West Bay project – Doha for M/s Buzwair Engg.
Design and field engineering for EHV, HV & LV cable circuits, Installation, testing & Commissioning of EHV, HV cables, substations and accessories for M/s Siemens – Doha - Phase VI - Project. (11 Circuits) and Salwa International Highway – Primary routes / Salwa Road – Phase-1.
| | Site Engineer- Electrical | E.T.A Engineering – Dubai | | September 2003 to June 2004. | Abu Dhabi | Installation, testing & commissioning of 11KV/415V, 2500 KVA Transformers & switchgears,
Lighting & small power system, installation, testing & Commissioning of Low current system like fire alarm, CCTV etc,
|
| | |
|
|
|